AI illustration: Model S and X production ends next quarter (Q2 2026)
Delivered

Model S and X production ends next quarter (Q2 2026)

“We expect to wind down S and X production next quarter and basically stop production of Model S and X next quarter.”
What actually happened

After Musk's January 28, 2026 announcement, Tesla built the last Model S and Model X units at its Fremont plant in early May 2026 and confirmed on X that production of both premium models had ended. The wind-down was completed within Q2 2026, ahead of the June 30 deadline, as the lines are repurposed for Optimus. electrive.com ↗

The Progression

Jan 28, 2026
The promise: “We expect to wind down S and X production next quarter and basically stop production of Model S and X next quarter.” · Tesla Q4 2025 Earnings Call — Musk on winding down Model S/X ↗
May 9, 2026
Delivered — on time. After Musk's January 28, 2026 announcement, Tesla built the last Model S and Model X units at its Fremont plant in early May 2026 and confirmed on X that production of both premium models had ended. The wind-down was completed within Q2 2026, ahead of the June 30 deadline, as the lines are repurposed for Optimus. electrive.com ↗
Today · Jul 20, 2026
Status: Delivered · on time. It happened.

On the Q4 2025 earnings call Musk announced the end of Tesla's two flagship vehicles after 14 years, freeing the Fremont lines for Optimus robot production. The final Model S and Model X (a 350-unit Signature Edition run) rolled off the line on May 9, 2026 — inside the stated window. One of the rare Musk timelines that landed on schedule.

Win the argument. Share the receipt.
The post comes pre-loaded with his quote, the clock, and the share card — one tap and it's settled.

Receipts

LAST CHECKED 2026-06-27

Discussion

Loading…

More from the feed

Cybertruck volume production in 2022

“If we get lucky, we'll be able to do a few deliveries toward the end of this year, but I expect volume prod…”
goalposts: 20222023late 2023 · moved 2×
called JAN 20210.9 years late
← Supervised FSD approval in Europe by Feb 2026 Fremont S/X lines become an Optimus factory making 1M robots/year →
/// The Daily Verdict
Know the moment a prediction lands — or doesn't.
One email a day, only when something changes: a new promise, a blown deadline, a goalpost move, or a rare on-time delivery. No spam, instant unsubscribe.